Friday Harbour Marina

FRIDAY HARBOUR MARINA LOCATION: Innisfil, Ontario PROJECT DATES: April 2017 – November 2017 Friday Harbour is a four season condominium resort described by the developers as “A destination marina surrounded by an eventful marina side village. A 200 acre nature preserve framing a Doug Carrick designed golf course. Modern, imaginative homes at the lake —…

Suncor – Additional Offloading Apron at Clairmont Bulk Plant

SUNCOR – ADDITIONAL OFFLOADING APRON AT CLAIRMONT BULK PLANT PROJECT DATES: 2014 In 2012 J+B completed the design of a state of the art Bulk Fuel Plant for Suncor in Clairmont Alberta. In 2014 Suncor invited us back to design the planned expansion of an addition offloading apron at the facility. Clairmont is a busy…

LNG (Liquid Natural Gas) Fuelling Station

LNG (LIQUID NATURAL GAS) FUELLING STATION – ENN CANADA PROJECT DATES: Completed 2016 J+B has provided complete (Civil, Mechanical, Electrical & Structural) engineering design and project management services to a permanent LNG fuelling station in Chilliwack B.C., as well as two temporary fuelling stations in Merit and Kamloops B.C. for ENN Canada. J+B was responsible…

Stand By Generator – Imperial Oil Limited

STAND BY GENERATOR – IMPERIAL OIL LIMITED LOCATION: Calgary, Alberta PROJECT DATES: 2011 J+B was engaged in providing consulting services and commissioning support for the installation of a new 600kW diesel standby generator on rooftop of the 35 floor building. The successful cut over from the existing 350kVA backup generator was completed without interruption to…

Compressed Natural Gas Facility – Pura Energy for Manitoba Hydro

COMPRESSED NATURAL GAS FACILITY LOCATION: Winnipeg, Manitoba PROJECT DATES: 2016-2017 J+B were contracted by Pura Energy to support their design efforts to build a Compressed Natural Gas Facility for Manitoba Hydro South of Winnipeg. The facility is designed to fill tanker trailers with bulk compressed natural to be used to supply houses and businesses if…

CNG Time Fill fuelling facility – Pura Energy for GFL (Green for Life) Alberta 2015

CNG TIME FILL FUELLING FACILITY – PURA ENERGY FOR GREEN FOR LIFE LOCATION: Alberta PROJECT DATES: 2015-2016 J+B provided Canadian Building Code and regulatory code review forGFL (Green for Life) Triline Disposal facility located in Sherwood Park,Alberta. The project was for an industrial trickle slow fill Compressed Natural Gas (CNG) facility for GFL to fill…